Badami Utility

Badami Utility Pipeline (red)
Badami Utility Pipeline (red)

The Badami Utility Pipeline begins at the Endicott Causeway, where it connects to the fuel gas line that feeds the Satellite Drilling Island from the Endicott Main Production Island. The 6.625-inch, 31-mile long utility pipeline transports fuel gas and product to the Badami Central Production Facility. The Right-of-Way Lease became effective December 15, 1997.


Badami Utility News

There is no current Badami Utility news.

Current Operator
  • Savant Alaska LLC
Original ROW Lease Dates
  • December 15, 1997 - December 14, 2022
Product
  • Natural Gas & Product
Diameter (inches)
  • 6.625
System Length (approx. miles)
  • System Length: 31.00
  • Length on State Lands: 31.00
Normal Wall Thickness (inches)
  • 0.375
  • 0.432
Associated ADL Numbers
  • 415965
Positions
  • Above Ground
Year Constructed
  • 1998 - 1998